System migration is necessary when the current technologies become obsolete, and more efficient platforms become available. The client required to adopt a new platform when their legacy system can no longer handle evolving business needs. The project dealt with S/390 to AS/400 and iSeries.
Client:
A large statewide insurance provider
Project Definition:
- Implementation of medical claim format upgrade – simultaneous with platform conversion effort
- Migration of the entire processing environment from IBM S/390 to AS/400 platform
- Modification of claim processing source code to run on the AS/400 platform
Primary Project Components:
- Configuration of the new environment, including all databases and system facilities
- System analysis and development of job and functional flowcharts
- Development, testing and implementation
- Project management
- Post-implementation production support
Project Complexities/Deliverable:
- Meet the goals of an aggressive project timeline
- Convert large volumes of COBOL source code, IBM and other utilities from S/390 to AS/400
- Develop workaround solutions where original source code was not available
- Definition and configuration of the entire CICS environment (PPT, FCT tables, etc.)
- Full database conversion in a 48 hour window - transparent to the production environment
Project Technologies:
- IBM AS/400
- IBM S/390
- COBOL/400, COBOL/390
- CL
- CICS
- JCL
- VSAM
|